✅ Active Projects
—
🎯 Overall Progress
—
⛽ Wells in Project
—
🏗 Total Rigs
—
🚨 Risk Score
—
📈 Phase-wise Progress
Phase Completion by Category
Progress Trend
🗂 Wells Status Summary
🔍
Status:
Rig:
Location:
Type:
Group by:
Sort:
| Well Name | PDO ID | Type | Rig | Overall % | Loc.Prep | 📍 Location / Station | Exp.Rig On | Exp.Rig Off | Status |
|---|
🔍 Missing Fields by Category
📦 Procurement Health
📊 Milestone Completion
🗃 All 19 Projects — Portfolio View
● 6 Active · ○ 13 Inactive
Project Portfolio Summary
| Code | Project Name | Field | Wells | Completed | In Progress | Rigs | Status |
|---|
🗂 All Wells
Click any well for full details
🚨 Smart Alerts
⭐ My Watchlist
● Live · Week 10, 2026
Watched Wells
—
Your watchlist
Critical
—
Immediate action
At Risk
—
Monitor closely
⚡ High Risk AI
—
Forecast alert
Avg Progress
—
Watchlist avg
Avg Rig Delay
—
Above threshold
Progress Snapshot
week-over-week delta per watched well
AI Risk Scores
forecast score /100 per watched well
Rig Delay vs TD Delay
days behind plan · watched wells only
Active Drilling Stage
current stage per watched well
⚡ Activity Log
latest changes · watched wells
Open Errors — Watched Wells
click to expand explanation
Watched Wells — Full Detail
6 wells · 3 critical · 3 high AI risk
Sort:
| Well ID | Well Name | Type | Project | Progress | W/W Δ | Status | Rig Delay | Risk Score | Errors | Active Stage |
|---|
🤖
AI Rig Assignment Optimizer
Powered by Claude · distance-aware · availability-optimized
🚦 Derived Rig Status — All Wells
Report date: 10-Feb-2026
📊 Rig KPIs
Rigs Deployed
—
Avg Arrival Delay
—
Actual vs planned on-date
Avg Stay Duration
—
Off − On date
Days to Next Rig-On
—
Ready, Rig Pending
—
≥85% progress, no rig yet
Delayed / Overdue
—
Expected date past today
Rig On Location
—
Currently on site
Rig Off / Completed
—
Rig off date confirmed
Rig Status Distribution
Overall Progress by Well
Rig Arrival Delay by Well (days)
Days to Rig-On by Well
🏗 Rig-Level Summary
| Rig No. | Total Wells | Completed | On Location | Ready | Pre-Rig | Planned | Delayed | Next Rig-On | Rig Status | Action |
|---|
📋 Well-Level Rig Status Detail
| Well | Rig No. | Exp. Rig On | Act. Rig On | Act. Rig Off | Arrival Delay | Stay Duration | Days to Rig-On | Rig Status |
|---|
📍 Location Preparation KPIs
Location Readiness by Well (Radar)
Sub-Category Breakdown
🤖
Rig Assignment Optimizer
AI
Powered by Claude · considers rig location, distance & availability window
Detecting unassigned wells…
⏱
Rig Idle Time Prediction
AI MODEL
Predicts probability that a rig will sit idle because the next well is not ready on time · Gradient Boosting + Readiness Score
High Idle Risk
—
Rigs likely idle
Medium Risk
—
Monitor closely
Low Risk
—
On track
Avg Predicted Idle
—
days per rig
Total Idle Risk
—
days this period
Model Accuracy
84%
last 4 weeks
🏗 Per-Rig Idle Prediction
Predicted Idle Days by Rig
Readiness Score vs Idle Risk
scatter: each dot = one rig assignment
🔬 Feature Importance
Gradient Boosting model · relative contribution to idle prediction
📊 Readiness Breakdown by Well
loc + eng + construction composite readiness score
🔀 Recommended Resequencing
Wells where swapping rig order would reduce idle time
| Rig | Current Next Well | Readiness | Gap Days | Swap With | Swap Readiness | Est. Idle Saved | Action |
|---|
📋 Full Prediction Detail — All Rigs
| Rig | Current Well | Rig Off | Next Well | Exp. Next On | Loc % | Eng % | Const % | Readiness Score | Readiness Gap | Predicted Idle | Risk Class | Confidence |
|---|
Engineering Progress
—
FLAF Issued
—
Wells with FLAF
RAMZ IDs Received
—
Of project wells
SCR Raised
—
Design control records
Engineering Progress by Well
Engineering Timeline
Material PO Placed
—
Materials Delivered
—
At site
Flowline PO Issued
—
Of project wells
Open POs
—
Pending delivery
Material Progress by Well
PO Status Distribution
Procurement Details
| Well | Mat. PO No. | PO Placed | Avail at Site | Flowline PO | FL Dia | FL Length | Status |
|---|
🏭
Vendor Performance Intelligence
AI
Scorecard analytics · PO cycle time · delivery reliability · downstream schedule impact
Total Vendors
—
scored this period
Strong Reliability
—
score ≥75
Moderate
—
score 50–74
Poor Reliability
—
score <50 · escalate
Avg Lead Time
—
days PO→delivery
Avg Vendor Delay
—
days late vs baseline
🏆 Vendor Scorecard Ranking
Weighted: timeliness 40% · predictability 35% · schedule impact 25%
Score Distribution
Lead Time by Vendor
avg PO→delivery days
📅 PO Cycle Time Analysis
PO Placed → Receipt → Delivery · days per stage per well
🚨 Escalation List — Immediate Action
On-Time Delivery Trend (8 weeks)
📋 Full Vendor Performance Table
| Rank | Vendor / PO Ref | Work Package | Well(s) | PO Placed | PO Received | Delivery | Lead Time | PO Proc. Time | Vendor Delay | On-Time % | Score | Reliability | Schedule Impact |
|---|
⏳
Procurement Delay Forecasting
AI
Classifier for late/not-late · Regressor for expected delay days · Daily high-risk watchlist · Expedite priority queue
Total PO Lines
—
active orders
High Delay Risk
—
expedite now
Medium Risk
—
monitor weekly
Low / On Track
—
within SLA
Avg Predicted Delay
—
days on at-risk POs
Model Accuracy
82%
classifier F1 score
🚨 Expedite Priority Queue
—
Sorted by: late-arrival probability × downstream schedule impact
Lead Time Distribution by PO Type
actual vs SLA baseline · days
Predicted Delay Days by PO
regressor output · sorted high→low
🔬 Classifier Feature Importance
Which features most predict late arrival
SLA Compliance Trend (8 weeks)
% POs delivered within SLA
📋 Full Procurement Delay Forecast
| PO Reference | Type | Well | PO Placed | Expected Delivery | Actual / Predicted | Lead Time | SLA Days | Late Flag | Delay Prob. | Pred. Delay | Risk | Expedite Priority | Action |
|---|
🔎
Engineering Bottleneck Detection
AI
Outlier detection · milestone cycle-time control charts · stall detection · predictive bottleneck classification
Wells Tracked
—
Bottlenecks Active
—
stalled stages
Stall Warnings
—
slow progress
Avg Eng Duration
—
days
Avg Stall Days
—
since last milestone
Benchmark Cycle
28d
eng. target
📈 Cycle-Time Control Chart
Engineering duration per well · UCL / Mean / LCL control limits
🔬 Stage Completion Funnel
Wells completing each milestone · bottleneck = biggest drop
🔥 Stall Days Heatmap
Days stuck at each stage · green = flowing · red = stalled
Avg Cycle Time by Stage vs Benchmark
actual vs 5-day benchmark per stage
🚨 Active Bottleneck Wells — Escalate Now
Milestone Completion Rate Trend (8w)
📋 Full Engineering Bottleneck Table
| Well | Rig | Eng % | Survey | Survey Rpt | Design Start | Design AFC | Approved | AFC | Eng Duration | Stall Stage | Stall Days | Downstream Impact | Risk | Action |
|---|
Flowline Progress
—
Wells with FL Data
—
FL Completed
—
Dominant FL Diameter
—
Flowline Progress by Well
FL Construction Status
Avg OHL Progress
—
OHL Wells Tracked
—
Power Risk Level
—
Wells w/ OHL
—
OHL Progress by Well
Well Types
—
ESP Wells
—
PCP Wells
—
No Artificial Lift
—
Well Type Distribution
Artificial Lift by Well
📐
Construction Productivity Analysis
AI
Statistical control charts + anomaly detection · burn rate analysis · peer-group benchmarking by flowline complexity
Avg Productivity Score
—
progress/day
Above Benchmark
—
wells
Near Benchmark
—
±10% of target
Underperforming
—
>10% below target
Declining Trend
—
negative slope
Benchmark (peer avg)
—
%/day
🔥 Sub-Activity Burn Rates (W/W)
Current week vs previous snapshot — avg across all in-progress wells
📈 Control Chart — Overall Construction %
Weekly progress rate with UCL/LCL control limits
Productivity Score by Well
overall_const % ÷ construction days · vs peer benchmark
Sub-Activity Radar — Avg Completion
Piping · Electrical · Instrumentation · Welding/NDT · Fusion · Hydro test
⛽ Per-Well Productivity Detail
📋 Full Productivity Table
| Well | Rig | Peer Group | Piping 50% | Elect 30% | Instr 20% | Welding | Fusion | Hydro | Overall Const % | Const Days | Productivity | vs Benchmark | Burn Trend | Bottleneck | Status |
|---|
🔩
Flowline Construction Risk Detection
AI
Rule-based sequencing checks + late-finish classifier · grouped by diameter & length · sub-activity stall detection
FL Wells Tracked
—
High Risk
—
likely late
Medium Risk
—
Stalled Sub-tasks
—
out-of-sequence
Hydro-Test Ready
—
upstream complete
Flowline Risk Score by Well
Sub-Task Progress Heatmap
Cold bend · Sleeper · Welding/NDT · Fusion · Hydro test
⛽ Per-Well Flowline Risk Detail
📋 Full Flowline Risk Table
| Well | Rig | FL Dia | FL Length | FL % | Cold Bend | Sleeper | Welding | Fusion | Hydro | Risk Score | Blocking Task | Pred. Finish | Risk |
|---|
⚡
Electrical Infrastructure Delay Prediction
AI
OHL burn-rate regression · commissioning readiness gap · sequence sanity checks (tie-in should not lead installation)
OHL Wells
—
Miss Comm. Date
—
power at risk
Readiness Gap
—
avg days behind
Avg Burn Rate
—
%/day
Sequence Violations
—
tie-in before install
OHL Burn Rate vs Required Rate
Readiness Gap by Well
required comm. date − predicted OHL completion
Sub-Task Stage Breakdown
🤖 At-Risk Wells — Power Readiness
📋 OHL Delay Forecast Table
| Well | OHL (m) | OHL % | Pole Hole | Pole Erect | Conductor | TI | Burn Rate | Pred. Finish | Comm. Date | Gap | Delay Prob. | Risk |
|---|
🔌
Artificial Lift Installation Readiness
AI
Parallel cable + skid readiness streams · dependency-based scheduling · handover to commissioning window
AL Wells
—
Package Ready
—
both streams done
Cable Delayed
—
Skid Delayed
—
Both Delayed
—
expedite urgently
Avg Package Delay
—
days
Cable vs Skid Lead Time by Well
Package Ready Date vs Commissioning Window
⛽ Per-Well Readiness Streams
📋 AL Readiness Forecast Table
| Well | AL Type | Cable Req. | Cable Deliver. | Cable Install. | Cable LT | Skid Req. | Skid Deliver. | Skid Install. | Skid LT | Package Ready | Comm. Date | Late Prob. | Risk | Expedite |
|---|
Commissioning Progress
—
Wells Completed
—
Wells In Progress
—
RLMU Submissions
—
Overall Progress by Well
Completion Timeline
| Well | Exp. Rig On | Exp. Rig Off | Act. Rig On | Act. Rig Off | Type | Status |
|---|
FLAF Issued
—
RAMZ Compliance
—
SCR / MOC Raised
—
Tie-in Port Available
—
Documentation Compliance by Well
| Well | PDO ID | FLAF Date | RAMZ ID | SCR No. | Tie-in Port | Station | Compliance |
|---|
🔍 Data Quality Errors
Week 10, 2026 · All Projects
Critical Errors
—
Blocks KPI calcs
Warnings
—
Engineer review needed
Info
—
Minor gaps
SLA Breached
—
Overdue resolution
SLA Due Soon
—
<4h remaining
Open Errors — Feb 2026 · with SLA countdown
—
Error Trend (8 weeks)
SLA compliance rate (8 weeks)
Data Completeness by Well
Missing Fields by Category
🤖 Predictive Delay Forecast
● Live · Week 10, 2026
High Risk Wells
—
↑1 from last week
Medium Risk
—
Monitor closely
Low Risk
—
↑2 recovered
Avg Risk Score
—
↑6 per review
Forecast Accuracy
84%
Last 4 weeks
Risk Score — Signal Breakdown
5 signals · checked per well
Risk Distribution
47 wells · weekly
High Risk — Immediate Action Required
Medium Risk — Monitor Closely
Risk score trend — top 5 wells (8 weeks)
Threshold line at 70
All Wells — Risk Scores
| Well | Well Name | Type | Progress | Rig Delay | Risk Score | Delay Trend | Prog Slope | Stage Stall | Scope Risk | Data Rate | Risk Level |
|---|
📉 Variance Analysis
● Live · Week 10, 2026
Avg Rig Delay
—
↑1.3d worse
Avg TD Delay
—
↑1.1d worse
Wells >14d Late
—
Critical threshold
On Schedule
—
↑2 recovered
Plan vs Actual — Rig On Date
Delay Distribution
Wells grouped by delay bucket
Weekly Delay Heatmap — Top 10 Wells
Rig delay per week · color = severity
Early / On time
1–14d late
>14d late
Cumulative Rig Delay — Top Wells
8-week rolling trend
Delay by Rig Unit
Average rig delay per rig
Full Variance Detail — All Wells
| Well | Rig | Planned Rig On | Actual / Exp On | Rig Delay | TD Delay | Progress | Delay Band | Trend |
|---|
🔮 Predictive Insights
Est. Completion Date
—
Rig Delay Risk
—
Procurement Risk
—
Commissioning Readiness
—
Projected Completion Forecast
Risk Heatmap by Well
🗺 Field Operations Map
● Live · Nimr / Oman · UTM Zone 40N → WGS84
Total Wells
—
Completed
—
In Progress
—
Active Rigs
—
Coord Missing
0
📍 Selected Well
Click any marker on the map to view well details here.
📏 Distance KPIs
Select a well to compute distances.
Coord Completeness
🏗 Rig Travel Distances
| Rig | From Well | To Well | Distance (km) | Est. Mob. Time | Status |
|---|
🔄 Sync Log
● Live · Week 10, 2026
Last Sync
06:00
Today · Success
Rows Pulled
412
26 new · 386 updated
Avg Duration
8.4s
↓ 0.6s faster
Failed Syncs
1
Last 30 days
Sync History
Rows Pulled Per Sync (14 days)
Sync Duration Trend (14 days)
seconds per sync run
Data Change Rate
new vs updated rows per sync
📆
Well Completion Time Forecasting
AI
Random Forest Regression · predicts delivery date from lifecycle stage durations · updates every snapshot
Wells Modelled
—
active + completed
On / Ahead of Target
—
≤0d variance
Minor Delay Risk
—
1–14d variance
High Delay Risk
—
>14d variance
Avg Delivery Time
—
days eng→comm
Model Accuracy
87%
on completed wells
⛽ Per-Well Delivery Forecast
📅 Predicted vs Target Delivery Date
scatter · each dot = one well · above diagonal = delayed
Schedule Variance Distribution
days ahead (−) or behind (+) target
🔬 Top Delay Drivers
Random Forest feature importance · contribution to delivery variance
📊 Avg Stage Duration (days)
Engineering → Construction → Drilling → Commissioning
📋 Full Forecast Detail — All Wells
| Well | Rig | Eng Start | Eng Dur. | Const Dur. | Rig Dur. | Overall % | Predicted Delivery | Target Date | Variance | Delay Prob. | Risk | Top Driver |
|---|
✅
Commissioning Readiness Prediction
AI
Gating rules + regression model · checks all prerequisites · identifies missing gate blocking readiness
Wells Assessed
—
active + upcoming
All Gates Open
—
comm. can start
1–2 Gates Blocked
—
minor intervention
3+ Gates Blocked
—
critical — intervene
Avg Readiness Score
—
out of 100
Production Accepted
—
WLCTF approved
🚦 Gate Check Matrix
All 6 prerequisite gates · ✅ open · ⚠ partial · 🔴 blocked
Readiness Score by Well
Commissioning Sub-Progress Radar
Mechanical · Electrical · Instrumentation · Overall comm.
⛽ Per-Well Commissioning Readiness
📅 Predicted Commissioning Start & Duration
Gantt view · predicted start + duration band · regression model output
📋 Full Commissioning Readiness Table
| Well | Rig | Eng ✓ | Const ✓ | OHL ✓ | AL ✓ | Acceptance | Mech % | Elec % | Instr % | Comm % | Readiness | Gates Blocked | Pred. Start | Est. Duration | Delay Prob. | Risk |
|---|
🔗
Critical Path AI Identification
AI
Graph-based CPM logic · AI infers likely path switches · dynamic recalculation on prerequisite change
Wells Analysed
—
Critical Tasks
—
zero float
Near-Critical
—
float ≤5d
Avg Path Length
—
days
Path Switches
—
predicted
Avg Free Float
—
days buffer
🔗 Critical Path Chain
Zero-float tasks — any slip extends final delivery
Task Float Distribution
📅 Critical Path Gantt
Phases per well · red = critical · amber = near-critical
Slip Impact Simulator
Projected completion impact if a task slips N days
📋 Full Critical Path Table
| Well | Phase | Start | Finish | Duration | Free Float | Total Float | Critical? | Slip Impact |
|---|
🧩
Project Delay Root Cause Analysis
AI
SHAP-style stage attribution · benchmark comparison · NLP-enriched remark analysis
Wells Analysed
—
Avg Eng Delay
—
days
Avg Const Delay
—
days
Avg Rig Delay
—
days
Top Root Cause
—
dominant stage
Program Delay
—
total days
📊 Delay Attribution by Stage
Stacked: Eng · Procurement · Construction · Rig · Commissioning
Root Cause Pareto
Stage frequency as dominant delay source
🧩 Per-Well Root Cause Breakdown
📋 Root Cause Detail Table
| Well | Eng Delay | Proc Delay | Const Delay | Rig Delay | Comm Delay | Total Delay | Root Cause Stage | Contribution % | Intervention Owner |
|---|
🗂
Well Program Optimization
AI
Operations research · configurable priorities · maximize readiness value − idle penalties − lateness penalties
Wells Scored
—
High Value
—
ready to sequence
Idle Days Saved
—
vs current plan
Avg Program Score
—
0-100
Resequence Recs
—
suggested swaps
Lateness Penalty
—
days at risk
🗂 Recommended Sequence
Optimal well order per rig · drag-to-reorder in production
Program Value Score by Well
Optimized vs Current Plan — Trade-off Analysis
📋 Program Optimization Table
| Rank | Well | Rig | Current Seq | Opt Seq | Readiness | Priority | Value Score | Idle Penalty | Action |
|---|
🔬
Operational Anomaly Detection
AI
Isolation Forest · robust z-score · weekly delta analysis · data vs operational anomaly classification
Snapshots Checked
—
Critical Anomalies
—
investigate now
Data Anomalies
—
likely data errors
Operational
—
real events
Avg Anomaly Score
—
Progress Jumps
—
≥15% / week
🔬 Anomaly Score Distribution
Weekly Progress Delta (8 weeks)
Jumps outside ±2σ flagged as anomalies
🚨 Investigation Queue
📋 Full Anomaly Log
| Well | Week | Anomaly Type | Field | Expected | Actual | Delta | Z-Score | Anomaly Score | Classification |
|---|
👷
Resource Allocation Optimization
AI
Linear programming · criticality-weighted priority · greedy crew assignment · expected days saved
Wells in Scope
—
Under-Resourced
—
tasks
Crew Moves Rec'd
—
Days Saved
—
if moves actioned
Avg Resource Gap
—
% effort
Avg Priority Score
—
Priority Score vs Resource Gap
Top-right = most critical, most under-resourced
Recommended Crew Moves
From surplus → deficit activity · days saved estimate
Workload Demand by Phase
📋 Resource Allocation Table
| Well | Phase | Task | Remaining % | Days Left | Criticality | Priority Score | Resource Gap | Rec. Action | Days Saved |
|---|
🤖
Autonomous Project Control AI
AI
Digital PM · learns stage duration patterns · compares live wells vs expected curves · surfaces explanations not scores
Wells Monitored
—
Auto Escalations
—
management flags
Actions Triggered
—
this week
Avg Health Index
—
0-100
Program Delay Prob
—
Risk Stage
—
most risky
Well Health Index Dashboard
Weighted: variance 40% · productivity 35% · data quality 25%
Autonomous Action Log
Actions triggered by PM AI this period
Stage Risk Heat Map
📋 Autonomous PM Monitoring Table
| Well | Rig | Health Index | Risk Stage | Delay Prob. | Eng Variance | Productivity | Data Quality | Escalated | Recommended Action |
|---|
🧬
Self-Healing Data Intelligence System
AI
Rule checks → classification → conservative imputation → human review routing · auto-repairs with full audit trail
Avg Completeness
—
filled / monitored fields
Auto-Healed
—
safe auto-repairs
Pending Review
—
human decision needed
Open Errors
—
unresolved
Date Seq. Errors
—
finish before start
Avg Confidence
—
repair confidence
📊 Completeness Score by Field
filled values ÷ total monitored records · target ≥90%
Error Classification Breakdown
Missing · Inconsistent · Date Sequence · Out-of-Range · Anomalous
✅ Auto-Heal Queue
High-confidence repairs · applied automatically · traceable
⚠ Human Review Queue
Complex or high-risk issues · suggested correction · approve / reject
Repair Confidence Distribution
Data Quality Score Trend (8 weeks)
📋 Full Repair Log & Audit Trail
| Well | Field | Error Type | Detected | Current Value | Suggested Repair | Confidence | Method | Action | Status | Approve |
|---|